It is now commonly used for floor beams, piles and railways sleepers, as well as structures such as bridges, water tanks, roofs and runways. Generally, prestressed concrete is not necessary for columns and walls, however, it can be used economically for tall columns and high retaining walls with high bending stresses.
As a general rule, traditional reinforced concrete is the most economic method for a span of up to 6 m.
DESIGNED TO BE BETTER
Simplicity of design means quick and easy on site assembly of Tee- Beams. Once erected this floor provides a safe working platform for site operatives the space between joist to joist is filled with Hollow blocks. Service pipes, electrical wiring etc can all be easily incorporated into the build. Tee- Beams offer longer spans than timber floor construction; this is beneficial when building larger rooms.
EFFICIENT AND SAFE
A superior alternative to traditional timber floor construction Tee-Beams and block filling not only offer warm energy efficient buildings but also quieter ones.
The mass of prestressed concrete floors provides an effective sound barrier, offering future inhabitants a more appealing habitat. Due to the fire-resistant nature of pre-stressed concrete structures are also safer. These inherent qualities make concrete homes better homes.
Benefits continued:
- Fire rating – The pre-stressed beams in BBF help in increasing the fire rating of buildings due to the large cover provided for the tendons.
- Assembly time – There is time saving realized with the BBF system because the elements are pre-cast. Assembly takes a very short time resulting in faster construction timelines. This positively impacts the program of work.
- Structural benefits – The pre-stressed beams minimize potential cracks, decrease the risk that would have been presented by reinforcement corrosion and also lengthens the service life of a building.
- Increased head-room – There is an increased floor to floor height because the floor system rests on top of the reinforced concrete beams of the building’s frame.
- Sound insulation – The concrete hollow blocks help in insulating the slab by breaking sound waves resulting in buildings that are quieter.
- Fire rating – The pre-stressed beams in BBF help in increasing the fire rating of buildings due to the large cover provided for the tendons.
- Assembly time – There is time saving realized with the BBF system because the elements are pre-cast. Assembly takes a very short time resulting in faster construction timelines. This positively impacts the program of work.
- Structural benefits – The pre-stressed beams minimize potential cracks, decrease the risk that would have been presented by reinforcement corrosion and also lengthens the service life of a building.